Manufacturing / From knit to shipment
Made in one connected operation.
From circular knitting through dyeing, finishing, inspection and shipment, every stage is coordinated around the material brief.
A process built around the material.
Development, production and verification stay connected from the first reference through to finished fabric.
-
01
Fabric analysis
Construction, weight and shade are reviewed against the brief before knitting starts.
-
02
Circular knitting
Fabric is knitted to the agreed construction.
-
03
Dyeing
Fabric is dyed to the approved shade.
-
04
Brushing & peaching
An optional step, used where the fabric and order call for surface softness.
-
05
Heat-setting & finishing
Fabric is stabilised and finished for width and hand-feel.
-
06
Quality inspection & physical testing
Fabric is inspected using the four-point system, with defects recorded before approval.
-
07
Warehousing & shipment
Approved fabric is stored, packed and prepared for shipment.
Manufacturing at a glance.
One connected operation — knitting, dyeing and finishing, inspection and warehousing — measured in confirmed daily output.
Knitting → Dyeing & finishing → Inspection → Warehouse & shipment
88
Circular knitting machines
Approx. 16 tonnes of greige fabric per day
45 + 7
45 dyeing vats
+ 7 heat-setting machines
Approx. 25 tonnes per day
6
Inspection machines
Approx. 30 tonnes per day
Production capacity varies by fabric construction, finish and order requirements.
Inside the production floor.
Real production areas, photographed as they run — knitting, dyeing, inspection and warehousing.




Development & quality
Production stays close to development.
Material development, colour review and physical checks help keep the final fabric aligned with the brief.
Explore capabilities
Start with a sample
Let’s make something worth wearing.
Tell us the structure, weight and hand-feel you need. We’ll match it against the library and begin with the right material conversation.

